FAQs
More FAQs- When will I be able to walk on my floors?
- What is post construction cleaning?
- How long will it take to have my hard floors coated with urethane?
The most rapid dry time is four hours but we recommend allowing eight hours before walking on the floor.
Construction clean-up is a service provided to brand new buildings or buildings that are being remodeled. While building contractors will do a general clean-up of construction debris, a detailed clean is required to remove all the dust and dirt left behind.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. The coating application can be accomplished at a rate of 750 square feet per hour with a two-person crew.